Contact

Rules and delivery

Wide and heavy loads: when extra planning is required

In brief

Size alone does not establish whether a permit is required. The complete vehicle and load, the route and the rules in each country must be assessed together.

Practical example

A machine fits on a low-loader but cannot pass a bridge on the shortest route. A different route or specialist approval may be needed.

Actual dimensions and weight

Measure the load in its travel configuration, including protrusions, fitted equipment and transport frames. Check the weight of the entire load rather than relying solely on a machine brochure. The vehicle combination and the permissible loading of roads and bridges also matter.

What makes a load indivisible?

An indivisible load generally cannot reasonably be separated without disproportionate cost or risk of damage. A preference to carry several removable items together does not itself make them indivisible. Exact definitions and exemptions depend on the rules of each country.

Permits and conditions

Some abnormal loads can move under general provisions subject to conditions; others require a specific permit or additional measures. Route, vehicle markings, time restrictions and bridge capacity may affect what can be agreed. Large dimensions alone do not establish the full legal position.

Provide the details early

Send dimensions, total weight, photographs, drawings if available and both addresses. A low-loader might carry a machine but still be unable to reach its destination by the shortest road. Any route investigation or permit requirement needs to be understood before dates are confirmed.

Information to confirm before booking

  • Actual width, length, height and weight of the load
  • Can the load be divided?
  • Are drawings or clear photographs available?
  • Is the route to both addresses accessible?
  • Does the schedule allow time for any necessary permits?