Contact

Vehicles, machinery and boats

Preparing a boat for transport by road

In brief

Preparation is about the vessel and the collection site together. Loose fittings, lift points and the receiving arrangements need attention before the transporter arrives.

Practical example

An unsecured canopy frame can move during a journey and damage the hull; a detached mast also needs its own support and restraint.

Record condition

It can be helpful to photograph the hull, keel, rails, drive and existing marks before collection. Note any removed equipment and where it is stored. When the boat is ashore, photographs of its supports and access for lifting equipment may help with planning.

Loose equipment

Mooring lines, fenders, cushions, tools and loose items should be secured or handled as agreed. Something stored inside a boat is not automatically suitable to remain there during transport. Pay particular attention to unsecured covers and hatches.

Masts and projecting fittings

Masts, aerials, canvas frames and superstructure can affect overall height and wind exposure. Clarify what must be removed and how separate parts will be supported and transported. A detached mast is a load in its own right and needs suitable handling.

Agree lifting and delivery

Lifting points, sling positions and cradling may need assessment against the boat's construction and manufacturer instructions, where necessary with specialist lifting staff. Tell us about any known restrictions. Responsibilities for lifting, unloading, reception and the final standing area should be agreed before the booking is confirmed.

Information to confirm before booking

  • Photograph the hull, keel and equipment
  • Secure or remove loose equipment
  • Prepare the mast and projecting parts
  • Confirm suitable cradle, support or lifting arrangements
  • Arrange reception and unloading