In brief
An industrial component's shape and centre of gravity may matter as much as its overall mass. Lifting arrangements need to fit the item.
Practical example
A heavy electrical cabinet has a high centre of gravity and surfaces that must not be compressed. A basic pallet may not be enough.
Describe the component
Identify the actual item rather than using only 'industrial goods'. A transformer, electrical cabinet and machinery frame can require different lifting and support. Photographs and drawings help establish dimensions and constraints.
Weight and centre of gravity
Total mass alone may not explain how a load behaves during lifting. Mention an offset centre of gravity and any manufacturer's lifting instructions. Check uncertain weights against documentation rather than appearance.
Supporting the load
Industrial equipment may require a bespoke frame or base so that vulnerable surfaces do not bear the load. Identify sensitive panels, cables and fittings and ensure loose parts are secured.
Handling at both ends
Crane, forklift, overhead hoist and loading dock each have different reach and capacity limits. Clarify what equipment and personnel are available at collection and delivery. A road vehicle alone cannot be assumed to perform every lift.
Checklist before transport
- Component purpose and handling needs
- Actual dimensions, weight and centre of gravity
- Drawings and photographs
- Suitable lifting points and transport supports
- Lifting equipment available at both addresses
About this guidance: These articles provide general information and practical recommendations, not individual legal advice or binding instructions for a specific shipment. Examples are not universal statutory requirements. Rules, contracts and circumstances differ and may change. Consult the current rules of the relevant authority and the agreed terms for the assignment.